SPECIFICATION OF TOTAL INVESTMENTS
(000 EUR)
DESCRIPTION |
YEAR |
|
2003 |
2004 |
2005 |
2006 |
2007 |
TOTAL |
| 1. INFRASTRUCTURE |
224,139 |
275,219 |
228,7774 |
172,382 |
116,070 |
1.016,584 |
| 2. ROLLING STOCK*) |
50,346 |
89,671 |
152,640 |
100,065 |
42,474 |
435,196 |
| 3. INTERMODAL EQUIPMENT |
810 |
500 |
500 |
300 |
100 |
2,210 |
| 4. INFORMATION SYSTEM |
2,440 |
3,740 |
4,610 |
2,920 |
1,130 |
14,840 |
| INVESTMENTS IN BASIC ASSETS |
277,735 |
369,130 |
386,524 |
275,667 |
159,774 |
1.468,830 |
| 5. STUDIES AND PROJECTS |
450 |
300 |
|
|
|
750 |
| 6. ENVIRONMENT |
2,500 |
2,000 |
2,000 |
1,500 |
0 |
8,000 |
| 7. HUMAN RESOURCES |
4,604 |
2,496 |
2,000 |
0 |
0 |
9,100 |
| TOTAL |
285,289 |
373,926 |
390,524 |
277,167 |
159,774 |
1.486,680 | *) The figure includes the resources for rolling stock maintenance
THE INVESTMENT PLAN REPRESENTS THE PRIORITY NEEDS OF RTE "BEOGRAD" IN THE SCOPE OF INFRASTRUCTURE AND ROLLING STOCK IN ORDER TO QUALIFY THOSE ELEMENTS FOR REALIZATION OF THE EXPECTED VOLUME OF PASSENGER AND FREIGHT TRAFFIC INCLUDING ACCEPTABLE LEVEL OF SERVICE QUALITY. CONSIDERING THE FORMER PERIOD OF BAD MAINTENANCE OF STABILE AND MOBILE MEANS, WE CAN SAY THAT EVEN WITH THOSE, RELATIVELY MODEST REQUIREMENTS, THE DEFINED INVESTMENT PLAN MOSTLY REMAINS UNCOVERED BY INVESTMENT SOURCES. FOR ITS COVERING IT IS NECESSARY TO PROVIDE OWN MEANS AND FAVORABLE LOANS AND CREDITS. FOR NOW, THE ACTUAL LOANS ARE THOSE OBTAINED FROM THE EBRD AND EIB IN THE SCOPE OF THE REALIZATION OF THE PROJECT ENTITLED "REHABILITATION OF THE RAILWAY INFRASTRUCTURE IN SERBIA", WHICH INCLUDES EMERGENCY MEASURES, I.E. QSR PROJECTS.
|